Jeff Berry used an acetylene rig to heat the remaining end connector on the right side. With sledge hammer, tanker bars and muscles, the end connector was freed.


The right track now broken and ready for removal.


Don places 20 ton bottle jacks under Cobra King so that the rear end can be raised enough to roll a heavy dolly underneath.


Bottle jacks are placed under the right and left rear bogies.


After enough height was acheived, the dolly was pushed in as far as possible.


More jacks are placed in the front and Charles and Len begin jacking up the front end.


Home Page · Cobra King Project Page · Previous Page · Next Page